The Town of Plevna completed a two-phase water storage and distribution system replacement in 2015. In 2014, Stahly Engineering designed and provided construction administration services for Phase 1 which included the installation of a 204,000-gallon water storage tank, construction of a new pump house with pressure boosting system, replacement of 8,600 lineal feet of water main, and new service connections. Phase 2 completed the replacement of the remaining water mains and services in town with an additional 12,000 LF of mains replaced.
Project Size
20.600 LF
Project Value
$3.3m
Year Completed
2015
Details
Stahly Engineering performed survey, engineering design, and construction administration and inspection. The construction cost of the project was $3.3 million. The scope of work also included full0time onsite inspection.
Got a project in mind?
Drop us a line today and tell us about it. Our friendly staff is standing by to answer your questions and get your project across the finish line.