Our Projects

MSU Practice Facility

Overview

Stahly provided structural engineering services for Montana State University’s new 115,000-square-foot Indoor Training Facility in Bozeman, Montana. Located southwest of Bobcat Stadium, the facility was designed to provide year-round indoor athletic training space for Bobcat student-athletes. The primary structure is a pre-engineered metal building that houses a 100-yard artificial turf football field and an indoor track, creating a large, open-span environment for practices, conditioning, and athletic development.

The facility also includes a 3,500-square-foot stick-built support structure with a lobby, restrooms, changing areas, storage, and mechanical space. This support area provides the necessary amenities and functional spaces to serve athletes and facility operations.

The project also involved complex site work to accommodate existing grading and elevation changes. A notable component was the construction of a 10-foot retaining wall southwest of Bobcat Stadium, which helped address site elevation differences and accommodate the facility’s placement. The project brought together the large-span athletic building, supporting spaces, and challenging site conditions to create a dedicated indoor training environment for Montana State University.

Project Size

115,000 sqf

Project Value

$NA

Year Completed

2025

Details

  • Pre-engineered metal building provides the primary structural system.
  • Large clear-span design accommodates the 100-yard indoor football field.
  • 3,500-square-foot stick-built structure provides support and service spaces.
  • 10-foot retaining wall addresses site elevation changes and grading requirements.
  • Structural systems accommodate the indoor track and athletic training spaces.

Got a project in mind?

Drop us a line today and tell us about it. Our friendly staff is standing by to answer your questions and get your project across the finish line.

We're hiring! Click to see available positions